Rooms are starting to take shape in the laboratory section with wall frames going up. Windows have also been installed in the east lab wall. This week, spray foam will be applied to the inside of the exterior walls in the lab. This should be an interesting process to watch. Some drywall work may also begin next week.
Most of the north parking lot is paved with concrete on the east side of the building scheduled for this week. Electrical, mechanical and plumbing work is ongoing. All roofing work should be done by the end of the month.
- New windows in the east lab wall.
- The rooms are beginning to take shape.
- The mechanical control room.
- The new parking lot.
- Footprint of the greenhouse.
- New limestone accents on the office windows.
- Front of the building.
- Stairway and elevator between levels.